Save Mart Unit 2
- Supply & Erection of 1225 sq/m Clearspan Formsteel Technologies Building.
- Five roller doors, PA doors and Tilt panels along the length (56m) of the East side of building Including earthworks, foundations and pad.
- Foundations and pad included 308 x 2.7m piles driven to the Hiley formula.
- Reid bars inserted into piles connecting to HD16 steel to form reinforcing for pad. Included Gas sealed methane barrier.
- Novaflow methane vents under pad connecting to rato vents either side of building. Included 50sq/m of office space.
- Alucobond and Aluclad feature cladding to office walls.
Project: Save Mart Unit Two
Location: Quarantine Road, Nelson
Size: 1225 Sqm Warehouse
Completion: May 2015